Loading 3D model
Tap here
Drag to rotate · Right-click or two fingers to pan · Scroll or pinch to zoom · Tap a part for details

All done

FAQ

Stuck?
Start here.

These are the issues buyers run into most when assembling. Tap one to jump to that step in 3D.

All steps

Assemble

  1. Check the site Choose level ground and clear obstacles around and underneath. Keep away from walls, fences, and walkways. Check overhead wires and branches.
  2. Check the frame parts Check 12 top tubes, 6 T-connectors, 6 sockets, 6 leg cross braces, and 12 leg extension tubes.
  3. Check the pads and hardware Check 1 each of the jump mat, safety net, and frame pad; 72 springs; 33 self-tapping screws; and 6 M5×44 bolts.
  4. Join top tube set 1 Join the T-connector top tube to the socket top tube, with the spring holes toward the ground. Push the tubes together until snug; do not form a circle yet.
  5. Join top tube set 2 Join the T-connector top tube to the socket top tube, with the spring holes toward the ground. Push the tubes together until snug; do not form a circle yet.
  6. Join top tube set 3 Join the T-connector top tube to the socket top tube, with the spring holes toward the ground. Push the tubes together until snug; do not form a circle yet.
  7. Join top tube set 4 Join the T-connector top tube to the socket top tube, with the spring holes toward the ground. Push the tubes together until snug; do not form a circle yet.
  8. Join top tube set 5 Join the T-connector top tube to the socket top tube, with the spring holes toward the ground. Push the tubes together until snug; do not form a circle yet.
  9. Join top tube set 6 Join the T-connector top tube to the socket top tube, with the spring holes toward the ground. Push the tubes together until snug; do not form a circle yet.
  10. Position leg set 1 Align both cross brace ends with the two extension tubes. Insert along the tube axes until the joints sit snugly and screw holes align.
  11. Tighten leg set 1 Install 1 self-tapping screw 15 at each end to secure both extension tubes to the cross brace, 2 total.
  12. Connect the legs to top tube set 1 Align both extension tubes with the leg sockets below the T-connector and socket. Press fully in along the axes.
  13. Secure frame section 1 Install 1 self-tapping screw 15 in the T-connector and 1 in the socket. This frame section uses 4 screws total. Check each for tightness.
  14. Position leg set 2 Align both cross brace ends with the two extension tubes. Insert along the tube axes until the joints sit snugly and screw holes align.
  15. Tighten leg set 2 Install 1 self-tapping screw 15 at each end to secure both extension tubes to the cross brace, 2 total.
  16. Connect the legs to top tube set 2 Align both extension tubes with the leg sockets below the T-connector and socket. Press fully in along the axes.
  17. Secure frame section 2 Install 1 self-tapping screw 15 in the T-connector and 1 in the socket. This frame section uses 4 screws total. Check each for tightness.
  18. Position leg set 3 Align both cross brace ends with the two extension tubes. Insert along the tube axes until the joints sit snugly and screw holes align.
  19. Tighten leg set 3 Install 1 self-tapping screw 15 at each end to secure both extension tubes to the cross brace, 2 total.
  20. Connect the legs to top tube set 3 Align both extension tubes with the leg sockets below the T-connector and socket. Press fully in along the axes.
  21. Secure frame section 3 Install 1 self-tapping screw 15 in the T-connector and 1 in the socket. This frame section uses 4 screws total. Check each for tightness.
  22. Position leg set 4 Align both cross brace ends with the two extension tubes. Insert along the tube axes until the joints sit snugly and screw holes align.
  23. Tighten leg set 4 Install 1 self-tapping screw 15 at each end to secure both extension tubes to the cross brace, 2 total.
  24. Connect the legs to top tube set 4 Align both extension tubes with the leg sockets below the T-connector and socket. Press fully in along the axes.
  25. Secure frame section 4 Install 1 self-tapping screw 15 in the T-connector and 1 in the socket. This frame section uses 4 screws total. Check each for tightness.
  26. Position leg set 5 Align both cross brace ends with the two extension tubes. Insert along the tube axes until the joints sit snugly and screw holes align.
  27. Tighten leg set 5 Install 1 self-tapping screw 15 at each end to secure both extension tubes to the cross brace, 2 total.
  28. Connect the legs to top tube set 5 Align both extension tubes with the leg sockets below the T-connector and socket. Press fully in along the axes.
  29. Secure frame section 5 Install 1 self-tapping screw 15 in the T-connector and 1 in the socket. This frame section uses 4 screws total. Check each for tightness.
  30. Position leg set 6 Align both cross brace ends with the two extension tubes. Insert along the tube axes until the joints sit snugly and screw holes align.
  31. Tighten leg set 6 Install 1 self-tapping screw 15 at each end to secure both extension tubes to the cross brace, 2 total.
  32. Connect the legs to top tube set 6 Align both extension tubes with the leg sockets below the T-connector and socket. Press fully in along the axes.
  33. Secure frame section 6 Install 1 self-tapping screw 15 in the T-connector and 1 in the socket. This frame section uses 4 screws total. Check each for tightness.
  34. Turn section 1 upright With two people holding the top tubes and leg braces, lift off the ground, turn upright in a clear area, and lower onto the legs.
  35. Turn section 2 upright With two people holding the top tubes and leg braces, lift off the ground, turn upright in a clear area, and lower onto the legs.
  36. Turn section 3 upright With two people holding the top tubes and leg braces, lift off the ground, turn upright in a clear area, and lower onto the legs.
  37. Turn section 4 upright With two people holding the top tubes and leg braces, lift off the ground, turn upright in a clear area, and lower onto the legs.
  38. Turn section 5 upright With two people holding the top tubes and leg braces, lift off the ground, turn upright in a clear area, and lower onto the legs.
  39. Turn section 6 upright With two people holding the top tubes and leg braces, lift off the ground, turn upright in a clear area, and lower onto the legs.
  40. Join the frame into a full circle Connect the six upright frame sections end to end, alternating T-connectors and sockets. Push every joint fully in.
  41. Orient the jump mat Lay the jump mat flat on the ground with its orange warning label up and white ID label down.
  42. Align with the first door edge hole Align the first net hole left of the zipper with the first V-ring left of the warning label. Match each following hole to one ring.
  43. Pass the first ring through the net hole Flip up the first metal V-ring, pass through the net hole, and lay flat. Leave the metal ring outside the net for spring attachment.
  44. Thread through the remaining net holes Flip each V-ring up along the jump mat, pass through its matching net hole, and lay flat. Check that all 72 rings are exposed outside the net.
  45. Place the net and mat inside the circle With two people, lift the connected net and jump mat over the frame and set them on the ground inside the circle. Align the two warning labels with opposite T-connectors.
  46. Attach the first spring Align the doorway with a T-connector. Attach the small hook to the V-ring left of the door, pull outward, and seat the large hook in the top tube hole left of that connector.
  47. Attach one spring directly opposite Move to the opposite side of the trampoline. Attach the small hook to the V-ring left of the other warning label and pull the large hook into the hole left of the opposite T-connector.
  48. Complete all six connector locations Attach 1 spring to the left of each remaining T-connector, 4 more. Match each V-ring to its top tube hole, for 6 springs installed total.
  49. Complete all twelve locating springs Attach 1 spring to the left side of each of the 6 sockets, for 12 total. Leave 5 V-rings and 5 top tube holes empty between adjacent springs.
  50. Add springs, round 1 Starting at the doorway, work clockwise around the circle. Add only 1 spring to the left of the installed spring in each section, 12 per round, before starting the next round.
  51. Add springs, round 2 Starting at the doorway, work clockwise around the circle. Add only 1 spring to the left of the installed spring in each section, 12 per round, before starting the next round.
  52. Add springs, round 3 Starting at the doorway, work clockwise around the circle. Add only 1 spring to the left of the installed spring in each section, 12 per round, before starting the next round.
  53. Add springs, round 4 Starting at the doorway, work clockwise around the circle. Add only 1 spring to the left of the installed spring in each section, 12 per round, before starting the next round.
  54. Add springs, round 5 Starting at the doorway, work clockwise around the circle. Add only 1 spring to the left of the installed spring in each section, 12 per round, before starting the next round.
  55. Lay the complete frame pad Lift the complete frame pad over the frame and lower onto the springs. Align the six slits with the net sockets, covering all springs and top tubes.
  56. Wrap the outer ties around the frame Crouch beneath the pad, route each outer tie around opposite sides of the top tube, and tie a bow. Secure all around.
  57. Pass the inner ties through the V-rings For each pair of inner ties, pass one through a V-ring, then tie both in a bow. Check all around for slipping.
  58. Fit foam sleeves onto the straight tubes Slide foam sleeves onto the 6 straight tubes from the open ends. Push into place, leaving joints and mounting holes exposed. If tight, add a little water inside the foam.
  59. Fit foam sleeves onto the curved tubes Slide foam sleeves onto the 6 curved tubes from the open ends. Push into place, leaving joints and mounting holes exposed. If tight, add a little water inside the foam.
  60. Secure safety net pole 1 Insert the straight tube into the curved tube, two-hole end up and bend outward. Secure the joint with 1 self-tapping screw 15 until the tubes are secure.
  61. Secure safety net pole 2 Insert the straight tube into the curved tube, two-hole end up and bend outward. Secure the joint with 1 self-tapping screw 15 until the tubes are secure.
  62. Secure safety net pole 3 Insert the straight tube into the curved tube, two-hole end up and bend outward. Secure the joint with 1 self-tapping screw 15 until the tubes are secure.
  63. Secure safety net pole 4 Insert the straight tube into the curved tube, two-hole end up and bend outward. Secure the joint with 1 self-tapping screw 15 until the tubes are secure.
  64. Secure safety net pole 5 Insert the straight tube into the curved tube, two-hole end up and bend outward. Secure the joint with 1 self-tapping screw 15 until the tubes are secure.
  65. Secure safety net pole 6 Insert the straight tube into the curved tube, two-hole end up and bend outward. Secure the joint with 1 self-tapping screw 15 until the tubes are secure.
  66. Lift the safety net upper edge One person holds the upper edge of the gathered net, exposing the 6 strap loops. Keep the bottom connected to the jump mat, ready to install each pole cap.
  67. Insert pole cap 1 Pass the pole cap through the net upper strap loop, hexagonal hole toward the net and round hole toward the installer outside the circle.
  68. Connect the curved tube to pole cap 1 Lift the net pole from outside the circle with the bend outward. Insert the curved tube into the pole cap and align all three holes in the tube, cap, and strap loop.
  69. Secure pole cap 1 Insert M5×44 bolt 14 from the round-hole side through the aligned holes in the pole cap, strap loop, and curved tube. Tighten until the cap is secure.
  70. Insert pole cap 2 Pass the pole cap through the net upper strap loop, hexagonal hole toward the net and round hole toward the installer outside the circle.
  71. Connect the curved tube to pole cap 2 Lift the net pole from outside the circle with the bend outward. Insert the curved tube into the pole cap and align all three holes in the tube, cap, and strap loop.
  72. Secure pole cap 2 Insert M5×44 bolt 14 from the round-hole side through the aligned holes in the pole cap, strap loop, and curved tube. Tighten until the cap is secure.
  73. Insert pole cap 3 Pass the pole cap through the net upper strap loop, hexagonal hole toward the net and round hole toward the installer outside the circle.
  74. Connect the curved tube to pole cap 3 Lift the net pole from outside the circle with the bend outward. Insert the curved tube into the pole cap and align all three holes in the tube, cap, and strap loop.
  75. Secure pole cap 3 Insert M5×44 bolt 14 from the round-hole side through the aligned holes in the pole cap, strap loop, and curved tube. Tighten until the cap is secure.
  76. Insert pole cap 4 Pass the pole cap through the net upper strap loop, hexagonal hole toward the net and round hole toward the installer outside the circle.
  77. Connect the curved tube to pole cap 4 Lift the net pole from outside the circle with the bend outward. Insert the curved tube into the pole cap and align all three holes in the tube, cap, and strap loop.
  78. Secure pole cap 4 Insert M5×44 bolt 14 from the round-hole side through the aligned holes in the pole cap, strap loop, and curved tube. Tighten until the cap is secure.
  79. Insert pole cap 5 Pass the pole cap through the net upper strap loop, hexagonal hole toward the net and round hole toward the installer outside the circle.
  80. Connect the curved tube to pole cap 5 Lift the net pole from outside the circle with the bend outward. Insert the curved tube into the pole cap and align all three holes in the tube, cap, and strap loop.
  81. Secure pole cap 5 Insert M5×44 bolt 14 from the round-hole side through the aligned holes in the pole cap, strap loop, and curved tube. Tighten until the cap is secure.
  82. Insert pole cap 6 Pass the pole cap through the net upper strap loop, hexagonal hole toward the net and round hole toward the installer outside the circle.
  83. Connect the curved tube to pole cap 6 Lift the net pole from outside the circle with the bend outward. Insert the curved tube into the pole cap and align all three holes in the tube, cap, and strap loop.
  84. Secure pole cap 6 Insert M5×44 bolt 14 from the round-hole side through the aligned holes in the pole cap, strap loop, and curved tube. Tighten until the cap is secure.
  85. Raise safety net pole 1 Starting at the doorway, raise each pole clear of the frame. Pull the pole center outward to align the straight tube vertically with the socket, then press fully down.
  86. Raise safety net pole 2 Starting at the doorway, raise each pole clear of the frame. Pull the pole center outward to align the straight tube vertically with the socket, then press fully down.
  87. Raise safety net pole 3 Starting at the doorway, raise each pole clear of the frame. Pull the pole center outward to align the straight tube vertically with the socket, then press fully down.
  88. Raise safety net pole 4 Starting at the doorway, raise each pole clear of the frame. Pull the pole center outward to align the straight tube vertically with the socket, then press fully down.
  89. Raise safety net pole 5 Starting at the doorway, raise each pole clear of the frame. Pull the pole center outward to align the straight tube vertically with the socket, then press fully down.
  90. Raise safety net pole 6 Starting at the doorway, raise each pole clear of the frame. Pull the pole center outward to align the straight tube vertically with the socket, then press fully down.
  91. Insert end cap 1 From beneath the socket, align the end cap's raised tab upward with the square hole. Push fully up until the lower edge meets the socket.
  92. Insert end cap 2 From beneath the socket, align the end cap's raised tab upward with the square hole. Push fully up until the lower edge meets the socket.
  93. Insert end cap 3 From beneath the socket, align the end cap's raised tab upward with the square hole. Push fully up until the lower edge meets the socket.
  94. Insert end cap 4 From beneath the socket, align the end cap's raised tab upward with the square hole. Push fully up until the lower edge meets the socket.
  95. Insert end cap 5 From beneath the socket, align the end cap's raised tab upward with the square hole. Push fully up until the lower edge meets the socket.
  96. Insert end cap 6 From beneath the socket, align the end cap's raised tab upward with the square hole. Push fully up until the lower edge meets the socket.
  97. Secure the warning sign with cable ties Hang the warning sign on the frame beside the net doorway. Route the cable tie around the top tube and through the sign hole, then pass the tail through the locking head and pull tight.
  98. Check before use Check every screw, spring, and net ring. Confirm the pad ties and pole caps are secure and the net intact. Stop use if damaged.

Install a basketball hoop

  1. Check the basketball hoop parts 1 backboard, 1 hoop with net, 2 plastic support strips, 2 cord tensioner sets, and 1 basketball. Identify the backboard front and back first.
  2. Insert support strip 1 Place the backboard face down and find the upper sleeve openings on the back. Insert the plastic strips fully along the sleeves to flatten the board.
  3. Insert support strip 2 Place the backboard face down and find the upper sleeve openings on the back. Insert the plastic strips fully along the sleeves to flatten the board.
  4. Turn the backboard face up With both support strips fully inserted, hold the backboard edges, lift it, turn it over in a clear area, and lay flat face up.
  5. Hoop against the backboard Turn to the backboard front. Place the hoop side rods on the long hook-and-loop areas, avoiding the small top areas marked in the manual.
  6. Wrap tightly around the left side of the hoop Wrap this side's upper and lower hook-and-loop straps around the hoop rod and press firmly. The rod must not slip out.
  7. Wrap tightly around the right side of the hoop Wrap this side's upper and lower hook-and-loop straps around the hoop rod and press firmly. The rod must not slip out.
  8. Secure hanging cord 1 Pass the cord through the upper backboard corner loop first. Press and hold the tensioner button, feed the cord through, and tighten. Release and check the loop cannot slip.
  9. Secure hanging cord 2 Pass the cord through the upper backboard corner loop first. Press and hold the tensioner button, feed the cord through, and tighten. Release and check the loop cannot slip.
  10. Lift between the two poles One person steadies the ladder while the other holds the backboard. Lift it above the net, then position it between the two rear poles. Keep holding it.
  11. Fit cord loop 1 over the pole cap Keep supporting the backboard. Lift this cord loop above the pole cap and lower over the entire cap. Do not hang on the bolt tip.
  12. Tighten cord tensioner 1 Press and hold the tensioner button, feed the cord through, and pull the tail tight. Release and check the loop on the pole cap cannot slip.
  13. Fit cord loop 2 over the pole cap Keep supporting the backboard. Lift this cord loop above the pole cap and lower over the entire cap. Do not hang on the bolt tip.
  14. Tighten cord tensioner 2 Press and hold the tensioner button, feed the cord through, and pull the tail tight. Release and check the loop on the pole cap cannot slip.
  15. Check that the backboard is vertical Check both cords are locked and the backboard vertical. If the hoop droops, retighten and press all upper and lower side hook-and-loop straps firmly.